Fasteners Silvery Zulin Steel Rod Construction Formwork Thread Tie Bar

Product Details
Customization: Available
Application: Formwork Scaffolding
Certification: ISO
Still deciding? Get samples of US$ 0/Piece
Request Sample
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
281
Year of Establishment
2003-12-15
  • Fasteners Silvery Zulin Steel Rod Construction Formwork Thread Tie Bar
  • Fasteners Silvery Zulin Steel Rod Construction Formwork Thread Tie Bar
  • Fasteners Silvery Zulin Steel Rod Construction Formwork Thread Tie Bar
  • Fasteners Silvery Zulin Steel Rod Construction Formwork Thread Tie Bar
  • Fasteners Silvery Zulin Steel Rod Construction Formwork Thread Tie Bar
  • Fasteners Silvery Zulin Steel Rod Construction Formwork Thread Tie Bar
Find Similar Products

Basic Info.

Technics
Casting
Material
Steel
Type
Fasteners
Color
Silvery
Treatment
Black
Product Name
Tie Rod
Size
D20, D15
Length
Customizable
Transport Package
Package Box, Steel Pallet, Steel Frame, Container
Specification
Q235
Trademark
ZULIN
Origin
China
Production Capacity
100000 Meters Per Month

Product Description

Product Description                                                                                                                                                                                                                                                  
Fasteners Silvery Zulin Steel Rod Construction Formwork Thread Tie Bar

 Formwork tie-rod 

 

 

It is high quality construction formwork fastener and has been used to many large projects like high rise building, bridge, hydroelectricity, nuclear power projects.

 

Features:

1. High tensile strength.
2. High process precision, precise thread.
3. Surface treatment: It can be electroplated, hot dip galvanized or  according to the drawing,  sample or special requirement of clients.

 

 

 Detailed Images

Fasteners Silvery Zulin Steel Rod Construction Formwork Thread Tie BarFasteners Silvery Zulin Steel Rod Construction Formwork Thread Tie Bar
Accessary WarehoseFasteners Silvery Zulin Steel Rod Construction Formwork Thread Tie Bar

Parameters

PARAMETERS
Name Tie rod
Matertial  steel
Size diameter 15mm; 20mm
Type  thread
Process rooled, cool process
Catalog Formwork accessory
Marking(Logo)  null
Weight  1.5kg/meter; 2.7kg/meter




Related Products                                                                                                                                                                                                                                           
Fasteners Silvery Zulin Steel Rod Construction Formwork Thread Tie Bar
Fasteners Silvery Zulin Steel Rod Construction Formwork Thread Tie BarCompany Profile                                                                                                                                                                                                                                           
Fasteners Silvery Zulin Steel Rod Construction Formwork Thread Tie Bar

Beijing Zulin Formwork & Scaffolding Co.,Ltd is a leading company which develops, designs, manufactures, sells, and leases Formworks and Scaffoldings for construction projects in the field of civil and industrial engineering, roads and bridges, hydroelectric dams, nuclear power stations etc.

 

We are one of the pioneer companies which developed formwork and scaffolding in China. We have a team of dedicated and professional technical specialists which continuously improves our products offerings. The company have 2 excellent wooden beam production lines and 6 steel structure workshops.

 

With years of experiences in conducting our own research and development, we have gained recognition both in China and abroad based on our excellent techniques in this industry. We have won many intellectual properties, e.g. hydraulic auto-climbing formwork, Auto-climbing Protection Panel and many other types of formwork techniques.

 

We are constantly innovating in order to provide high quality products to our clients. As a result, we have received numerous compliments from our clients.

 

Beijing Zulin Formwork & Scaffolding Co.,Ltd is committed to our mission of striving for excellence and providing high quality products.We are dedicated to provide forward-moving technology, excellent products and services to both our existing and new clients.           

Fasteners Silvery Zulin Steel Rod Construction Formwork Thread Tie Bar

FAQ                                                                                                                                                                                                                                             
Fasteners Silvery Zulin Steel Rod Construction Formwork Thread Tie Bar

Q1. What do you do?

 

A: We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.

 

Q2. How many construction projects have you accomplished?

A: 600 both in China and abroad.

 

Q3. Have you accomplished any landmark?

A: Yes, we have. For example, PAFC (660 meters tall), The 21 Century Building, 2008 Beijing the Nest Main Stadium, CCTV New Site, Colombo Lotus Tower(Sri Lanka), Hong Kong-Zhuhai-Macau Bridge, Gezhouba Pubugou Hydropower Station etc.

 

Q4. What can you do for us?

A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.

B.We sell our products to the contractors, building companies, or trading companies

C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.

D.We provide remote or on-site instruction to the builders.

 

Q5. What do you need in order to make a brief design and quotation when we have a construction project to be built?

A: Structural drawing and section drawing.

 

Q6. How long does it take to make a brief design and quotation after we offer the structural drawing?

A: In general, it takes 5~7 days based on specific requirements of construction project.

 

Q7. How long dose it take to manufacture the products after the signing of contract?

A: In general, it takes 30~60 days based on the type and quantity of products to be produced.

 

Q8. Are your products available for leasing?

A: Our products are available for leasing in Indonesia, Singapore, Dubai, Australia, New Zealand. It depends on local relevant regulations in other countries.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier