Customization: | Available |
---|---|
After-sales Service: | Online Technical Support |
Warranty: | 1 Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Introduction
Single-side climbing formwork DXB-240 are mainly used in the concrete pouring of dam, pier, guy anchor, concrete protecting wall, tunnel, underground workshop and so on. As the concrete lateral pressure is entirely supported by anchor system and bracket, the wall-through tie-rod and additional reinforcement are not needed. The construction is easy, rapid and economical; the finished concrete surface is perfect and the waterproofness is excellent.
2. Pouring Process
3.Structure Sketches4.The Adjustment of Inclination of DXB-240
DXB-240 system can climb slantwise. The maximum angle is 30°.
5.Characteristics
1 | The lateral pressure of the concrete is entirely supported by the anchor system. Wall-through tie-rods are not needed. |
2 | The formwork can move backward entirely, which will be convenient for work. |
3 | The connecting components have a high standardization and universality. |
4 | The formwork can be adjusted horizontally or vertically as request. |
5 | DXB-240 system can be adjusted to meet the inclined concrete pouring. |
6.Parameters
PARAMETERS | |
Model | DXB-240 |
Number of Platform | 3~4 |
Width of Main Platform | 240 cm |
Maximum climbing Inclination Angle | 30° |
Maximum Space of Formwork's Moving Backward | 600 mm |
Tie Rod | Needn't |
Beijing Zulin Formwork & Scaffolding Co.,Ltd is a leading company which develops, designs, manufactures, sells, and leases Formworks and Scaffoldings for construction projects in the field of civil and industrial engineering, roads and bridges, hydroelectric dams, nuclear power stations etc.
We are one of the pioneer companies which developed formwork and scaffolding in China. We have a team of dedicated and professional technical specialists which continuously improves our products offerings. The company have 2 excellent wooden beam production lines and 6 steel structure workshops.
With years of experiences in conducting our own research and development, we have gained recognition both in China and abroad based on our excellent techniques in this industry. We have won many intellectual properties, e.g. hydraulic auto-climbing formwork, Auto-climbing Protection Panel and many other types of formwork techniques.
We are constantly innovating in order to provide high quality products to our clients. As a result, we have received numerous compliments from our clients.
Beijing Zulin Formwork & Scaffolding Co.,Ltd is committed to our mission of striving for excellence and providing high quality products.We are dedicated to provide forward-moving technology, excellent products and services to both our existing and new clients.
Q1. What do you do?
A: We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.
Q2. How many construction projects have you accomplished?
A: 600 both in China and abroad.
Q3. Have you accomplished any landmark?
A: Yes, we have. For example, PAFC (660 meters tall), The 21 Century Building, 2008 Beijing the Nest Main Stadium, CCTV New Site, Colombo Lotus Tower(Sri Lanka), Hong Kong-Zhuhai-Macau Bridge, Gezhouba Pubugou Hydropower Station etc.
Q4. What can you do for us?
A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.
B.We sell our products to the contractors, building companies, or trading companies
C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.
D.We provide remote or on-site instruction to the builders.
Q5. What do you need in order to make a brief design and quotation when we have a construction project to be built?
A: Structural drawing and section drawing.
Q6. How long does it take to make a brief design and quotation after we offer the structural drawing?
A: In general, it takes 5~7 days based on specific requirements of construction project.
Q7. How long dose it take to manufacture the products after the signing of contract?
A: In general, it takes 30~60 days based on the type and quantity of products to be produced.
Q8. Are your products available for leasing?
A: Our products are available for leasing in Indonesia, Singapore, Dubai, Australia, New Zealand. It depends on local relevant regulations in other countries.