Customization: | Available |
---|---|
After-sales Service: | Online Technical Support |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
the best choice for high rise buildings and bridges
1.Product Introduction
The power of the auto-climbing formwork comes from the hydraulic system which includes pump station, hydraulic cylinder and oil pipe . The hydraulic system can control the climbing of the climbing rail and the bracket. As a result, the steel rail and the bracket can inter-climb with the hydraulic system and the whole system will climb up steadily. Cranes are not needed during the construction. It's easy to operate, highly efficient and safe. It can climb both vertically and slantwise, therefore it is the best choice for the construction of high rise buildings and bridges.
2.Climbing Process
3.Major Components
Hydraulic Self-climbing Formwork 4.Platforms
5.Characteristics
1 | The formwork system can climb both vertically and slantwise fast. |
2 | The system can climb integrally or separately. The climbing process is steady, synchronous, and safe. |
3 | The formwork will not be dismantled until the construction is finished. The field will be saved and the hazard of formworks' breakage will be greatly reduced. |
4 | The system will furnish all-round platforms and additional platform is not needed. |
5 | The auto-climbing formwork can climb by itself and cleaning work can be done in situ. The use of tower crane will be greatly reduced. |
6.Parameters
PARAMETERS | |
Model | ZPM-100 |
Working Pressure of Hydraulic System | 100KN |
Number of Platform | 4~6 |
Height of Bracket | 12-17 meters |
Height of Climbing Per Time | 2.7-4.8 meters |
Climbing Speed | 6 meters/hour |
Width of the Main Platform |
2.8 meters |
Business Process
Completed ProjectsBeijing Zulin Formwork & Scaffolding Co.,Ltd is a leading company which develops, designs, manufactures, sells, and leases Formworks and Scaffoldings for construction projects in the field of civil and industrial engineering, roads and bridges, hydroelectric dams, nuclear power stations etc.
We are one of the pioneer companies which developed formwork and scaffolding in China. We have a team of dedicated and professional technical specialists which continuously improves our products offerings. The company have 2 excellent wooden beam production lines and 6 steel structure workshops.
With years of experiences in conducting our own research and development, we have gained recognition both in China and abroad based on our excellent techniques in this industry. We have won many intellectual properties, e.g. hydraulic auto-climbing formwork, Auto-climbing Protection Panel and many other types of formwork techniques.
We are constantly innovating in order to provide high quality products to our clients. As a result, we have received numerous compliments from our clients.
Beijing Zulin Formwork & Scaffolding Co.,Ltd is committed to our mission of striving for excellence and providing high quality products.We are dedicated to provide forward-moving technology, excellent products and services to both our existing and new clients.