Climbing Zulin Concrete Mould Doka Formwork Flat Form for High-Rise Building Factory

Product Details
Customization: Available
After-sales Service: Online Technical Support
Warranty: 1 Year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
281
Year of Establishment
2003-12-15
  • Climbing Zulin Concrete Mould Doka Formwork Flat Form for High-Rise Building Factory
  • Climbing Zulin Concrete Mould Doka Formwork Flat Form for High-Rise Building Factory
  • Climbing Zulin Concrete Mould Doka Formwork Flat Form for High-Rise Building Factory
  • Climbing Zulin Concrete Mould Doka Formwork Flat Form for High-Rise Building Factory
  • Climbing Zulin Concrete Mould Doka Formwork Flat Form for High-Rise Building Factory
  • Climbing Zulin Concrete Mould Doka Formwork Flat Form for High-Rise Building Factory
Find Similar Products

Basic Info.

Model NO.
ZPM-125, 100, 80, 50
Certification
ISO
Material
Steel Wood
Type
Climbing Formwork
Color
Blue, Green, White or Customized
Protection Height
2.5 Floors or 4.5 Floors
Width of Operating Platform
900mm
Number of Platform
0- 5
S.W.L. of The Operating Platform
1.0-3.0kn/Square Meter
S.W.L. of Unloading Platform
2 Tons
Transport Package
Package Box, Steel Pallet, Steel Frame, Container
Specification
Q235
Trademark
ZULIN
Origin
China
Production Capacity
100 Sets/Month

Product Description

Product Description                                                                                                                                                                                                          

 

ZPM-100 Crane-independent Hydraulic Automatic Climbing Formwork 

 

the best choice for high rise buildings and bridges

Climbing Zulin Concrete Mould Doka Formwork Flat Form for High-Rise Building Factory

1.Product Introduction

 

The power of the auto-climbing formwork comes from the hydraulic system which includes  pump station, hydraulic cylinder and oil pipe . The hydraulic system can control the climbing of the climbing rail and the bracket. As a result, the steel rail and the bracket can inter-climb with the hydraulic system and the whole system will climb up steadily. Cranes are not needed during the construction. It's easy to operate, highly efficient and safe. It can climb both vertically and slantwise, therefore it is the best choice for the construction of high rise buildings and bridges. 

 

2.Climbing Process
Climbing Zulin Concrete Mould Doka Formwork Flat Form for High-Rise Building Factory
3.Major Components
Climbing Zulin Concrete Mould Doka Formwork Flat Form for High-Rise Building Factory
Hydraulic Self-climbing Formwork Climbing Zulin Concrete Mould Doka Formwork Flat Form for High-Rise Building Factory4.Platforms
Climbing Zulin Concrete Mould Doka Formwork Flat Form for High-Rise Building Factory

5.Characteristics

 

 

1  The formwork system can climb both vertically and slantwise fast.
2  The system can climb integrally or separately. The climbing process is steady, synchronous, and safe.
3  The formwork will not be dismantled until the construction is finished. The field will be saved and the hazard of formworks' breakage will be greatly reduced.
4  The system will furnish all-round platforms and additional platform is not needed.
5  The auto-climbing formwork can climb by itself and cleaning work can be done in situ. The use of tower crane will be greatly reduced.

 

 

6.Parameters

 

PARAMETERS
Model ZPM-100
Working Pressure of Hydraulic System 100KN
Number of Platform 4~6
Height of Bracket 12-17 meters
Height of Climbing Per Time 2.7-4.8 meters
Climbing Speed 6 meters/hour

Width of the Main Platform

2.8 meters

 

Business Process                                                                                                                                                                                                          

Climbing Zulin Concrete Mould Doka Formwork Flat Form for High-Rise Building FactoryClimbing Zulin Concrete Mould Doka Formwork Flat Form for High-Rise Building FactoryCompleted Projects                                                                                                                                                                                                         
Climbing Zulin Concrete Mould Doka Formwork Flat Form for High-Rise Building FactoryClimbing Zulin Concrete Mould Doka Formwork Flat Form for High-Rise Building FactoryClimbing Zulin Concrete Mould Doka Formwork Flat Form for High-Rise Building FactoryClimbing Zulin Concrete Mould Doka Formwork Flat Form for High-Rise Building Factory
Company Profile                                                                                                                                                                                                         

Beijing Zulin Formwork & Scaffolding Co.,Ltd is a leading company which develops, designs, manufactures, sells, and leases Formworks and Scaffoldings for construction projects in the field of civil and industrial engineering, roads and bridges, hydroelectric dams, nuclear power stations etc.

 

We are one of the pioneer companies which developed formwork and scaffolding in China. We have a team of dedicated and professional technical specialists which continuously improves our products offerings. The company have 2 excellent wooden beam production lines and 6 steel structure workshops.

 

With years of experiences in conducting our own research and development, we have gained recognition both in China and abroad based on our excellent techniques in this industry. We have won many intellectual properties, e.g. hydraulic auto-climbing formwork, Auto-climbing Protection Panel and many other types of formwork techniques.

 

We are constantly innovating in order to provide high quality products to our clients. As a result, we have received numerous compliments from our clients.

 

Beijing Zulin Formwork & Scaffolding Co.,Ltd is committed to our mission of striving for excellence and providing high quality products.We are dedicated to provide forward-moving technology, excellent products and services to both our existing and new clients.   

Climbing Zulin Concrete Mould Doka Formwork Flat Form for High-Rise Building Factory

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier