Single-Side Climbing Formwork for High-Rise Bridge and Tower Concrete Shutting

Product Details
Customization: Available
After-sales Service: Online Technical Support
Warranty: 1 Year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
281
Year of Establishment
2003-12-15
  • Single-Side Climbing Formwork for High-Rise Bridge and Tower Concrete Shutting
  • Single-Side Climbing Formwork for High-Rise Bridge and Tower Concrete Shutting
  • Single-Side Climbing Formwork for High-Rise Bridge and Tower Concrete Shutting
  • Single-Side Climbing Formwork for High-Rise Bridge and Tower Concrete Shutting
  • Single-Side Climbing Formwork for High-Rise Bridge and Tower Concrete Shutting
Find Similar Products

Basic Info.

Model NO.
DXB-180, 240
Certification
ISO
Material
Steel Wood
Type
Climbing Formwork
Color
Yellow, Blue or Customized
Number of Platform
3~4
Tie Rod
Needn′t
Maximum Climbing Inclination Angle
30°
Application 1
Dam, Pier, Guy Anchor
Application 2
Concrete Protecting Wall, Tunnel
Transport Package
Package Box, Steel Pallet, Steel Frame, Container
Trademark
ZULIN
Origin
China
Production Capacity
1000 Sets/Month

Product Description

Product Description                                                                                                                                                                                                          
Single-Side Climbing Formwork for High-Rise Bridge and Tower Concrete Shutting
 
 

DXB-240 Single-side Climbing Concrete Formwork

Single-Side Climbing Formwork for High-Rise Bridge and Tower Concrete Shutting

1. Introduction

 

Single-side climbing formwork DXB-240 are mainly used in the concrete pouring of dam, pier, guy anchor, concrete protecting wall, tunnel, underground workshop and so on. As the concrete lateral pressure is entirely supported by anchor system and bracket, the wall-through tie-rod and additional reinforcement are not needed. The construction is easy, rapid and economical; the finished concrete surface is perfect and the waterproofness is excellent.

 

2. Pouring Process

Single-Side Climbing Formwork for High-Rise Bridge and Tower Concrete Shutting3.Structure Sketches
Single-Side Climbing Formwork for High-Rise Bridge and Tower Concrete Shutting

4.The Adjustment of Inclination of DXB-240

DXB-240 system can climb slantwise. The maximum angle is 30°.
Single-Side Climbing Formwork for High-Rise Bridge and Tower Concrete Shutting

5.Characteristics

 

 

1 The lateral pressure of the concrete is entirely supported by the anchor system. Wall-through tie-rods are not needed.
2 The formwork can move backward entirely, which will be convenient for work.
3 The connecting components have a high standardization and universality.
4 The formwork can be adjusted horizontally or vertically as request.
5 DXB-240 system can be adjusted to meet the inclined concrete pouring.

 

 

6.Parameters

 

PARAMETERS
Model DXB-240
Number of Platform 3~4
Width of Main Platform 240 cm
Maximum climbing Inclination Angle 30°
Maximum Space of Formwork's Moving Backward 600 mm
Tie Rod  Needn't

Business Process                                                                                                                                                                                                            
Single-Side Climbing Formwork for High-Rise Bridge and Tower Concrete ShuttingSingle-Side Climbing Formwork for High-Rise Bridge and Tower Concrete Shutting

Complete Projects                                                                                                                                                                                                             
  Single-Side Climbing Formwork for High-Rise Bridge and Tower Concrete ShuttingSingle-Side Climbing Formwork for High-Rise Bridge and Tower Concrete ShuttingSingle-Side Climbing Formwork for High-Rise Bridge and Tower Concrete Shutting
 
Company Profile                                                                                                                                                                                                            Single-Side Climbing Formwork for High-Rise Bridge and Tower Concrete Shutting

Beijing Zulin Formwork & Scaffolding Co.,Ltd is a leading company which develops, designs, manufactures, sells, and leases Formworks and Scaffoldings for construction projects in the field of civil and industrial engineering, roads and bridges, hydroelectric dams, nuclear power stations etc.

 

We are one of the pioneer companies which developed formwork and scaffolding in China. We have a team of dedicated and professional technical specialists which continuously improves our products offerings. The company have 2 excellent wooden beam production lines and 6 steel structure workshops.

 

With years of experiences in conducting our own research and development, we have gained recognition both in China and abroad based on our excellent techniques in this industry. We have won many intellectual properties, e.g. hydraulic auto-climbing formwork, Auto-climbing Protection Panel and many other types of formwork techniques.

 

We are constantly innovating in order to provide high quality products to our clients. As a result, we have received numerous compliments from our clients.

 

Beijing Zulin Formwork & Scaffolding Co.,Ltd is committed to our mission of striving for excellence and providing high quality products.We are dedicated to provide forward-moving technology, excellent products and services to both our existing and new clients.                               

Single-Side Climbing Formwork for High-Rise Bridge and Tower Concrete Shutting
FAQ                                                                                                                                                                                                                                  

Q1. What do you do?

A: We design and manufacture formwork and scaffolding products used for pouring concrete structure in the field of housing, multi-story structure, high rise buildings, towers, sports stadiums, bridges, hydropower stations, industrial structures etc.

 

Q2. How many construction projects have you accomplished?

A: 600 both in China and abroad.

 

Q3. Have you accomplished any landmark?

A: Yes, we have. For example, PAFC (660 meters tall), The 21 Century Building, 2008 Beijing the Nest Main Stadium, CCTV New Site, Colombo Lotus Tower(Sri Lanka), Hong Kong-Zhuhai-Macau Bridge, Gezhouba Pubugou Hydropower Station etc.

 

Q4. What can you do for us?

A.We offer our suggestions, drawings of formwork layout, and quotations to the owners, design institutes, or contractors of the construction projects.

B.We sell our products to the contractors, building companies, or trading companies

C.We support our worldwide peer companies with our outstanding formwork or scaffolding products.

D.We provide remote or on-site instruction to the builders.

 

Q5. What do you need in order to make a brief design and quotation when we have a construction project to be built?

A: Structural drawing and section drawing.

 

Q6. How long does it take to make a brief design and quotation after we offer the structural drawing?

A: In general, it takes 5~7 days based on specific requirements of construction project.

 

Q7. How long dose it take to manufacture the products after the signing of contract?

A: In general, it takes 30~60 days based on the type and quantity of products to be produced.

 

Q8. Are your products available for leasing?

A: Our products are available for leasing in Indonesia, Singapore, Dubai, Australia, New Zealand. It depends on local relevant regulations in other countries.

 

 

 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier