Introduction:
Single-side climbing formwork DXB-180 & DXB-240 are mainly used in the concrete pouring of dam, pier, guy anchor, concrete protecting wall, tunnel, underground workshop and so on. As the concrete lateral pressure is entirely supported by anchor system and bracket, the wall-through tie-rod and additional reinforcement are not needed. The construction is easy, rapid and economical; the finished concrete surface is perfect and the waterproofness is excellent.
Characteristic:
1. The lateral pressure of the concrete is entirely supported by the anchor system. Wall-through tie-rods are not needed.
2.The formwork can move backward entirely, which will be convenient for work.
3.Coupling is used for connecting the forms to make sure the forms standing in a straight line.
4.The connecting components have a high standardization and universality.
5.The formwork can prop to the finished concrete tightly to avoid dislocation or leakage.
6.The formwork can be adjusted horizontally or vertically as request.
7.DXB-180 system can be adjusted to inclined concrete pouring.
Pouring Process:
1.The 1st pouring: The lateral pressure is supported by bottom beam anchor system during the first pouring. Embedding the formwork anchor system in the wall which will be the most important supporting
parts during the next pouring.
2.The 2nd pouring (the 1st lift):The climbing bracketsare used in the secondpouring which are fixed on
the anchor system in thefinished wall.
3.The 3rd pouring (the 2nd lift): Fix the suspend platform under the whole system and the workers can remove the tensile bolts and v-climbing cones on the platform and then fill the holes left by the V-climbing cones. The later lifts are standard same as the second lift until the pouring is finished.
Our examples of application:
Wenchang Satellite Launch Site # 078 Project in Hainan ( in 2011 )
Product : Single-side climbing formworkDXB180
Project name:Yanji Meteorology Radar Tower (Jilin, China)( 181m)
Product:Single-side Climbing FormworkCB240, Auto-climbing Formwork QPM50
Construction unit: Jilin Construction Engineering co., LTD (in 2010)
Project name: Xiarong Expressway Bridge BT(3-6)part
Product: Single-side climbing formwork DXB180
Contruction unit : China Communication 2nd Navigational Bureau & China Railway First Group
Co.,Ltd.
Project name: Hanjiatuo Bridge (Chongqing, China)
Product: Single-side climbing formwork DXB180
Construction unit : The Fourth Engineering Co., Ltd. MBEC
Project name: Runyang Yangtze River Bridge (Jiangsu, China)
Product: Single-side climbing formwork DXB180
Construction unit :CCCC. Second Highway Engineering Bureau
Project name: Al Maha Sofitel Hotel (Doha)
Product: Single-side climbing formwork and wall formwork, table formwork, column formwork and
table formwork
Project name: LNG gasholder (South Korea)
Product: Single-side climbing formwork and wall formwork
Project name: U-Bora Tower ( Dubai, UAE )
Product: Single-side climbing formwork, table formwork, column formwork and beam formwork
Project name: Al-Sour Tower Project (Kuwait)
Product: Single-side climbing formwork
Project name: Majid Intersection (Saudi Arabia )
Product: Single-side climbing formwork and wall formwork
For more information, please visit www.made-in-china.com/showroom/zulinform or send email to kanshi@zulinform.